Home batteries

A home battery sale is won or lost at the fuse box

For a battery to go in, the house needs headroom on the main fuse, space in the fuse box, a wall or floor that fits the unit and often new circuits. Done checks this from photos before anyone drives out, and the customer approves any extra work in the app before installation day.

Trusted by

Laddboxbolaget
Elbilsvaruhuset
KG Knutsson
Tesla Energy
Laddstoppet
MidSum
Chargehome

AI pre-checks

Dealbreakers show up in the photos

The customer photographs the fuse box, the meter and the spot where the battery should go. Done's AI identifies the meter, reads the fuse box and flags missing capacity or space.

  • Problems surface while the order is new, not on installation day
  • Fewer cancelled installations and fewer second visits
Dealbreakers show up in the photos

What the pre-check answers before dispatch

Six questions that decide whether the installation can go ahead, answered from photos and order data.

  • Does the main fuse have the capacity the system needs, or is an upgrade required?
  • Is there room in the fuse box for the added breakers and protection?
  • Is there enough wall or floor space where the battery should go?
  • How long is the cable run from the fuse box to the battery?
  • Which meter is installed, and what does the grid connection allow?
  • Is there an existing charger or solar system the battery should work with?

Extra work, approved in advance

Fuse upgrades approved before installation day

Battery jobs often need more than the battery: a main-fuse upgrade, new circuits, a longer cable run. When the pre-check finds it, the installer prices it from your price list and the customer approves it in the app before the job is booked.

  • Prices come from your own price list, set in advance
  • The customer says yes in the app, not on the doorstep
  • Only approved costs can be invoiced, so nobody disputes the bill
  • If the customer says no, nobody has made a wasted trip
Fuse upgrades approved before installation day

Built for the scope of a battery job

Everything between the sale and a commissioned, documented system.

Commissioning protocols

Every system's commissioning is recorded in a structured report with photos. A PDF is generated per job and a webhook notifies your systems.

Electrical safety documentation

Documentation tied to the job and stored with the installation report. In Sweden, it follows Swedish electrical safety regulations.

Green technology deduction

Batteries that store self-produced electricity qualify for the Swedish green technology deduction. Done applies it on the invoice and checks it against Skatteverket with BankID.

Pairs with charger orders

Sell the battery together with an EV charger and run both through the same flow, coordinated as one installation for the customer.

Works with solar

Hybrid inverter and battery combinations run through the same flow, whether they are sold together or added to an existing system.

Installer capacity

500+ vetted installers, matched on location and skills, in the markets Done operates in.

Frequently asked questions

Sell more batteries without building an installation team

Bring your volumes and your product mix. We'll show you how a battery order moves from photo check to commissioned system.

Contact sales